QATRO, in collaboration with MMYPEM JR S.L.U., has been awarded to carry out the commissioning of a new waste to energy power plant in the United Kingdom, with full scope of service: mechanical, operation, electricity and instrumentation & control.
The Project, will have an installed capacity of 15 MWe for the electrical grid and 10 MWth for urban heating and will be able to process 150,000 tons of waste per year.